SEPTA trolley wire replacements done, tunnel could open in ‘weeks’
Since then, SEPTA has switched back to its old slider style, replaced segments of the 5 miles of wire that run through the tunnel and “filed down” other sections of rough, damaged wire by running test trolleys through the tunnels, Busch said. SEPTA said the repairs required materials that took weeks to source, and that … Read more